Prologis Washington Township site
Withdrawn or rejectedWashington Township, Macomb County
The applicant pulled it, or the municipality refused it and no application is live.
The project
- Electrical demand
- 800 MWreported estimate
Estimate reported by a third party, not confirmed by the developer
- Developer
- Prologis
- Serving utility
- DTE Electric
- Site size
- 312 acres
- Also on the record
- Withdrawn, and the developer says it will not pursue the site.
Last checked October 23, 2026. Every field above has been confirmed against the sources listed.
What has happened
Every entry carries the source it came from. Where the record gives no date, the entry says so rather than being placed by guesswork.
- May 19, 2026Prologis withdrew its application in a letter to the township's planning and zoning director, saying it would wait until the township adopts an ordinance governing data centers before proceeding. Planet Detroit
- June 23, 2026Prologis said it had decided not to pursue a project at the site. The township supervisor said Prologis told the township that DTE could not provide the power capacity in the timeframe it expected. WDIV ClickOnDetroit
Where the sources disagree
The 800 MW is from a 9 June 2025 Prologis email, released by the township under FOIA and reported by WDIV/ClickOnDetroit, describing energy use ramping to 800 MW over five years. It was never filed as a capacity. EDRA of Michigan lists 760 MW, which appears in no other source. The DTE explanation is the township supervisor’s account of what Prologis told him, not a statement from DTE.
Published rather than resolved. Picking a favourite number and printing it alone is how a tracker becomes an opinion.
Sources
Everything above traces to one of these. Local agendas and FAQ pages get replaced in place rather than archived, so each carries the date it was read.
- [1] Map of AI data centers in Michigan — EDRA of Michigan, read October 23, 2026
- [2] Washington Township data center developer withdraws application — Planet Detroit, read October 23, 2026
- [3] Washington Township residents demand transparency after data center emails exposed — WDIV ClickOnDetroit, read October 23, 2026
Watch the docket this project runs through
Large-load contracts, tariff changes and the cases contesting them all arrive as DTE Electric filings. Alerts go out when one is filed and when a comment deadline is set — which is the only window in which a comment counts for anything.