Thor Equities Augusta Township site

Withdrawn or rejected

Augusta Township, Washtenaw County

The applicant pulled it, or the municipality refused it and no application is live.

The project

Electrical demand
100 MWreported estimate

Estimate reported by a third party, not confirmed by the developer

Developer
Thor Equities, with Form8tion
Serving utility
DTE Electric
Site size
522.2 acres
Also on the record
Recall petitions against all seven trustees were awaiting signature certification for the November ballot.

Last checked September 7, 2026. Every field above has been confirmed against the sources listed.

What has happened

Every entry carries the source it came from. Where the record gives no date, the entry says so rather than being placed by guesswork.

  1. July 22, 2025The township board adopted Ordinance No. 2025-02, rezoning seven parcels totalling 522.2 acres from Agricultural Residential to General Industrial. Ballotpedia
  2. August 4, 2026Voters repealed the ordinance, 2,314 against to 269 in favour — 89.59% to 10.41% on the county’s certified canvass. Washtenaw County Clerk / Register of Deeds

On the record, but undated

No source consulted gives a date for these, so they are not placed in the sequence above.

  1. Date not on the recordResidents petitioned the ordinance to a referendum. Ballotpedia

Where the sources disagree

The 522.2-acre figure is the land actually rezoned by Ordinance 2025-02. Reporting has also described a wider campus of roughly 810 acres across nineteen parcels, and one tracker lists about 1,000 acres; those describe the assembled site, not the rezoning, which is why the smaller number is the one carried here. Vote counts are the county’s own, taken from the Washtenaw County Clerk’s election reporting rather than from a third party, and they are now certified. Checked on 25 August 2026 the results page offered an “Unofficial Election Results” report of 12 August 2026; on 7 September 2026 the same page serves “Official Election Results” for the 4 August 2026 primary, created 31 August 2026, with 112 of 112 precincts fully counted. The certified figures are identical to the unofficial ones, so nothing here moved except its standing. The 100 MW capacity comes from a third-party tracker and has not been confirmed by the developer.

Published rather than resolved. Picking a favourite number and printing it alone is how a tracker becomes an opinion.

Sources

Everything above traces to one of these. Local agendas and FAQ pages get replaced in place rather than archived, so each carries the date it was read.

  1. [1] Michigan data center tracker Cleanview, read August 21, 2026
  2. [2] Augusta Township, Michigan, rezone Agricultural Residential to General Industrial for data center initiative (August 2026) Ballotpedia, read August 21, 2026
  3. [3] Augusta Township voters overturn data center rezoning WEMU, read August 21, 2026
  4. [4] Meeting minutes Augusta Township (primary document), read August 21, 2026
  5. [5] August 4, 2026 primary election results, “Augusta Twp Zoning Referendum”. Official Election Results; report created 31 August 2026, 112 of 112 precincts fully counted. Washtenaw County Clerk / Register of Deeds (primary document), read September 7, 2026

Watch the docket this project runs through

Large-load contracts, tariff changes and the cases contesting them all arrive as DTE Electric filings. Alerts go out when one is filed and when a comment deadline is set — which is the only window in which a comment counts for anything.

New filings and comment deadlines for DTE Electric. No newsletter, no sharing your address. Unsubscribe in one click — what we store.